TESCO LTD.

OUR WORK

Construction Supervision for
Suvarnabhumi Airport Development

4 เมษายน 2563
20 views
INFORMATION
Location
Suvarnabhumi Airport, Samut Prakarn Thailand
Owner
Airport of Thailand PCL.
Project Cost
888 Million Baht
Project Period
1 September 2016 – 30 November 2019
Description

New Passenger Satellite Terminal at Bangkok Suvarnabhumi Airport

Services Rendered

Supervision work for the construction of airplane terminals and land roads at the front level of the passenger terminal in the following areas

The construction of the airplane terminals secondary building 1 (B2 floor, B1 floor and G floor), the secondary satellite terminal building 1 and southern connection tunnel (Structural work and main system work)
The construction of the secondary satellite terminal building 1 (2nd floor - 4th floor) and the tunnel connecting the south (subsystem work)
The construction of the extension of the east passenger terminal, airline office building and east side parking
Utility system construction
Procurement work and installation of the Automated People Mover System (APM)
Procurement work and installation of baggage handing system (BHS) and explosive detection system (EDS)